Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/1105
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Faki, Silas | - |
dc.contributor.author | Musa, Yusuf | - |
dc.contributor.author | Annah, Hassan | - |
dc.date.accessioned | 2024-05-16T07:58:31Z | - |
dc.date.available | 2024-05-16T07:58:31Z | - |
dc.date.issued | 2017-07 | - |
dc.identifier.uri | https://doi.org/10.22632/ccs-2017-252-32 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/1105 | - |
dc.description.abstract | Estimating software cost in an agile system in terms of effort is very challenging. This is because the traditional models of software cost estimation do not completely fit in the agile development process. This paper presents a methodology to enhance the cost of project estimation in agile development. The hybridization adopts Class Responsibility Collaborators models with function point thereby boosting the agile software development estimation process. The study found out that adopting the Hybridized Class Responsibility Collaborator with function point has great improvement on cost estimation in agile software development. | en_US |
dc.publisher | Circulation in Computer Science | en_US |
dc.subject | Agile development, Class Responsibility Collaborators, Function points, Line of codes, Scrum, Software estimation models | en_US |
dc.title | Hybridization of Class Responsibility Collaborators Model (HCRCM) with Function Point to enhance Project Estimation Cost in Agile Software Development | en_US |
Appears in Collections: | Research Articles |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Hybridization of Class Responsibility Collaborators Model.pdf | Main Article | 351.09 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.