Design Error: A Source of Cost and Time Overrun in Construction Projects

Show simple item record

dc.contributor.author OREWERE, Emmamoge
dc.date.accessioned 2024-05-28T13:56:50Z
dc.date.available 2024-05-28T13:56:50Z
dc.date.issued 2018-06
dc.identifier.issn 2394-2630
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/1495
dc.description.abstract The study investigated the impact of design error on cost and time overrun of construction in Nigeria. Descriptive research design of the survey type was used. The opinion of Consultants, Contractors and Clients were sought through Questionnaires and interviews. The research studies reveal that design error affects the final cost of a construction project causing cost and time overrun. Additionally, the research revealed that the issue of cost and time impacts on project construction could be managed by using construction recognized and accepted methodologies which identifies and quantifies the overall impact to the project. It concludes that unclear scope of work or change in scope of projects in work; time and inexperience of the Architect and inaccuracy of the design documents are the major causes of design error in construction projects in Nigeria .Based on these findings, the researchers recommended adequate design review, proper planning and inspection of projects, clear scope of work and adequate time be given to produce clear and error free designs and specifications. en_US
dc.language.iso en en_US
dc.publisher Journal of Scientific and Engineering Research, CODEN (USA): JSERBR en_US
dc.relation.ispartofseries Volume 5;Number 8
dc.subject Clients, Consultants, Contractors, Design Error en_US
dc.title Design Error: A Source of Cost and Time Overrun in Construction Projects en_US
dc.type Article en_US